• Up • Ulmerton Rd. • Suncoast Parkway •

 

 

.

SR-688 (Ulmerton Road) Pinellas County, Florida: This project involves an east-west urban principal arterial located in the cities of Clearwater and Largo, Florida.  The limits of this project are from El Centro/Ranchero to just west of US–19 and include one major intersection at SR-693 (66th Street).  SR-688 is currently a 4-lane divided highway with intermittent right turn lanes, open drainage ditches, a raised median and no sidewalks.  This section of SR-688 is designated as a bicycle route by Pinellas County and PSTA operates a bus route in both directions.  Development along this section is primarily commercial and residential.  This project includes reconstruction of SR-688 to improve the level of service.  The proposed typical section submitted includes 6 through lanes west of SR-693 and 6 through lanes with 2 auxiliary right turn lanes east of SR-693.  The third lane throughout the project will be 12 feet to help accommodate the 14% truck traffic.

The proposed typical section includes a 4-foot bicycle lane and 6-foot sidewalk in each direction and a raised median that varies in width from 19.5 to 31.5 feet.  Dual left turn lanes are proposed for all approaches to the SR-693 intersection and for the eastbound approach of the US-19 intersection.  This project also includes adding one northbound through lane on SR-693, from SR-688 to 142nd Avenue North.  SR-693 is currently a 4-lane divided rural typical section with a depressed median and open ditches.  The additional lane will connect to an existing right turn lane at 142nd Avenue North.  Northbound SR-693, from SR-688 to 142nd Avenue North, will also be resurfaced to improve tie-in of the new lane and cleanup of MOT striping.  The approaches on SR-693 will include sidewalks and bicycle lanes within the reconstruction limits.

Client: FDOT, District 7
Construction Cost: $
Completion Date: